Build Right Logo

 

 

 

 

 

 

 

 

 

© 2026 Buildright
docker
Steni Foundation Wall Panels - Unventilated system Image

Steni Foundation Wall Panels - Unventilated system

Installation guide for Steni Foundation Wall unventilated system on high-compressive-strength insulation.

Steni
Foundation wall
Unventilated

24 articles in this module

1.

Renew your foundation wall In 1-2-3

(2 articles)

1.1.

Benefits of Steni Foundation Wall Panels - unventilated solution

1.2.

Planning for unventilated solution

2.

Receive and handle the panels

(4 articles)

2.1.

Control the delivery

2.2.

Strap panels during transport

2.3.

Store panels protected on a flat surface

2.4.

Lift panels straight and carry on their side

3.

Prepare for installation

(4 articles)

3.1.

Use correct protective equipment

3.2.

Use the right materials and equipment

3.3.

Installation principles on existing foundation wall

3.4.

Ensure that the insulation is clean, even, and secured

4.

Install the foundation wall panels

(7 articles)

4.1.

Measure and cut the foundation wall panels

4.2.

Drill installation holes in the foundation wall panels

4.3.

Drill holes for Iso anchors in the insulation

4.4.

Drill Iso anchors into the insulation

4.5.

Fasten the foundation wall panel and joint profiles

4.6.

Install corner profiles

4.7.

Install corner elements

5.

Maintenance of your the foundation wall panels

(6 articles)

5.1.

Immediately after installation

5.2.

Maintain and clean regularly

5.3.

Use correct cleaning agent

5.4.

High pressure washing

5.5.

Remove Paint, Grafitti, Varnish, Stain etc.

5.6.

Other pollutants

6.

Documentation

(1 articles)

6.1.

Product documentation
Language: